1
Sod Stripping & Excavation
Remove sod / excavate — per sq ft with depth
FG
Final Grade & Aggregates
Topsoil, sand & rock — per cubic yard
| Material | Rate/yd³ | Quantity | Subtotal |
|---|
2
Sod Install Rates
Manderely Less Water Sod — per sqft
| Material | Rate/sqft | Quantity | Subtotal |
|---|
3
Rock & Gravel Install
Drainage, road crush & decorative rock — per yd³
| Material | Rate/yd³ | Quantity | Subtotal |
|---|
4
Mulch Install Rates
Cedar, bark & wood chip — per cubic yard
| Material | Rate/yd³ | Quantity | Subtotal |
|---|
5
Potted Tree & Shrub Install
Potted, caliper trees & staking — per unit
6
Fencing Install Rates
Pressure treated wood fencing — per linear foot
| Material | Rate/lft | Quantity | Subtotal |
|---|
Gate Install Add-on
7
Deck Installation
Pressure treated decks — per deck
8
Shed Installation
Storage sheds — per shed
+
Custom Line Items
Add extra charges, credits, or notes to the quote
9
Landscape Edging
Landscape & paver edging — per linear foot
| Material | Rate/lft | Quantity | Subtotal |
|---|
ME
Manual Entry & Line Items
Add zones/materials without drawing on the map
A
Access & Complexity
Additional charges for site conditions
Additional complexity charge
$